Fervo, Sage Geosystems tap energy giants to scale next-gen geothermal

Maria Gallucci | Source: Canary Media | Posted 09/09/2025

Keyword Tags:

Sage’s deal means it can bring its first commercial power project online sooner, while Fervo’s move helps push its Cape Station facility closer to competition.


AI generated summary

Fervo Energy and Sage Geosystems, two innovative startups in the geothermal energy sector, have recently partnered with established industrial giants to expedite their projects. Fervo has teamed up with Baker Hughes to provide essential equipment for its Cape Station geothermal plant in Utah, aiming for a 2028 completion. This collaboration will enhance the plant's capacity to 500 megawatts, utilizing Fervo's advanced fracking-based geothermal technology. Meanwhile, Sage has partnered with Ormat Technologies to deploy its next-generation geothermal technology at existing sites, potentially bringing its first commercial power project online by late 2026 or early 2027.

Both companies are leveraging technological advancements to tap into geothermal energy, which currently accounts for only 0.4% of U.S. electricity generation. Their partnerships not only allow for faster scaling but also provide access to existing infrastructure and resources. As the demand for clean energy rises, these collaborations signify a pivotal shift in the geothermal industry, with both startups poised to contribute significantly to the renewable energy landscape while benefiting from bipartisan support and favorable policies.



Link to Original Article

Please find the link to the full article below. (Please note that content provider might require a paid subscription)


Source Link: https://www.canarymedia.com/articles/geothermal/fervo-sage-partner-large-companies-tech

Create a free trial account: Sign Up

Grid monitor is free to try. No credit card required


Already have an account? Login

Most Active PUCT Filings

CY 2025 RETAIL PERFORMANCE MEASURE REPORTS PURSUANT TO 16 TAC 25.88 - (114 filings)

CY 2024 RETAIL ELECTRIC PROVIDER (REP) ANNUAL REPORTS AND CY 2025 REP SEMI-ANNUAL REPORTS PURSUANT TO 16 TAC 25.107(I) - (106 filings)

APPLICATION OF EL PASO ELECTRIC COMPANY FOR AUTHORITY TO CHANGE RATES - (76 filings)

APPLICATION OF ONCOR ELECTRIC DELIVERY COMPANY LLC FOR AUTHORITY TO CHANGE RATES - (73 filings)

BROKER REGISTRATIONS - (71 filings)

APPLICATION OF ENTERGY TEXAS, INC. TO AMEND ITS CERTIFICATE OF CONVENIENCE AND NECESSITY FOR THE CYPRESS-TO-LEGEND 500-KV TRANSMISSION LINE IN HARDIN AND JEFFERSON COUNTIES - (53 filings)

AGGREGATOR ANNUAL REPORTS - (43 filings)