The Impact of Limiting Renewables in Texas with Olivier Beaufils

Doug Lewin and Nathan Peavey | Source: douglewin.com | Posted 05/16/2025

Keyword Tags:

Aurora Energy’s Olivier Beaufils on what modeling reveals about the grid and cost impacts of limiting renewable development, and the massive potential benefits of efficiency & demand response


AI generated summary

The article discusses the potential consequences of Texas limiting new wind and solar energy projects, as proposed by several bills in the Texas Senate. According to modeling by Aurora Energy Research, such actions could lead to significantly higher power prices, increased risk of rolling outages, and reduced grid reliability. By 2035, power prices could rise by 14%, and by 2050, they may jump by 38%. Additionally, a conservative forecast suggests that 400,000 to 600,000 homes could experience power loss during peak summer conditions due to insufficient capacity replacement.

The second part of the article highlights the importance of demand-side solutions, such as residential demand response and energy efficiency upgrades, which can alleviate stress on the grid while saving money for Texans. Key findings indicate that demand response could save households an average of $87 annually, and industrial customers could save $2 million each year. The article emphasizes the need for a diverse, flexible, and efficient grid to ensure affordability and reliability, especially in light of Texas's growing energy demands and extreme weather conditions.



Link to Original Article

Please find the link to the full article below. (Please note that content provider might require a paid subscription)


Source Link: https://www.douglewin.com/p/the-impact-of-limiting-renewables

Create a free trial account: Sign Up

Grid monitor is free to try. No credit card required


Already have an account? Login

Most Active PUCT Filings

APPLICATION OF ENTERGY TEXAS, INC. TO AMEND ITS CERTIFICATE OF CONVENIENCE AND NECESSITY FOR THE SETEX AREA RELIABILITY PROJECT IN JASPER, MONTGOMERY, NEWTON, POLK, SAN JACINTO, TRINITY, TYLER, AND WALKER COUNTIES - (195 filings)

APPLICATION OF EL PASO ELECTRIC COMPANY FOR AUTHORITY TO CHANGE RATES - (120 filings)

CY 2025 RETAIL PERFORMANCE MEASURE REPORTS PURSUANT TO 16 TAC 25.88 - (119 filings)

BROKER REGISTRATIONS - (88 filings)

APPLICATION OF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC FOR APPROVAL OF ITS 2026-2028 TRANSMISSION AND DISTRIBUTION SYSTEM RESILIENCY PLAN - (70 filings)

PROJECT TO SUBMIT EMERGENCY OPERATIONS PLANS AND RELATED DOCUMENTS UNDER 16 TAC § 25.53 - (60 filings)

CY 2024 ANNUAL POWER LINE INSPECTION & SAFETY REPORT IN PURSUANT TO 16 TAC § 25.97(F) - (59 filings)