Robot revolution in grid-level solar panel installations rolls into Texas

Lana Ferguson | Source: San Antonio Express News | Posted 05/10/2025

Keyword Tags:

With the United States in the midst of the biggest solar buildout in its history ― installing a record-breaking 50 gigawatts of new solar capacity last year and with Texas leading the way ― energy companies are racing to build large-scale solar farms.


AI generated summary

The article discusses the innovative use of robotics in solar panel installations, particularly in Texas, where Rosendin Electric is developing a prototype solar robot. This initiative comes as the U.S. experiences a significant solar buildout, with Texas leading the charge. The robot, designed in collaboration with ULC Technologies, features a fully autonomous panel delivery arm and can operate continuously in challenging environments, enhancing the efficiency and safety of solar farm construction.

During a demonstration at the Sequoia Solar project, which is set to become one of North America's largest photovoltaic facilities, the robot showcased its capabilities in handling heavy solar modules. The automation not only alleviates the physical burden on workers but also increases installation rates significantly compared to traditional methods. Rosendin aims to partner with manufacturers to make this robotic technology available to solar builders globally, further accelerating the adoption of renewable energy.



Link to Original Article

Please find the link to the full article below. (Please note that content provider might require a paid subscription)


Source Link: https://www.expressnews.com/business/article/robot-solar-panel-installation-texas-20310932.php

Create a free trial account: Sign Up

Grid monitor is free to try. No credit card required


Already have an account? Login

Most Active PUCT Filings

APPLICATION OF ENTERGY TEXAS, INC. TO AMEND ITS CERTIFICATE OF CONVENIENCE AND NECESSITY FOR THE SETEX AREA RELIABILITY PROJECT IN JASPER, MONTGOMERY, NEWTON, POLK, SAN JACINTO, TRINITY, TYLER, AND WALKER COUNTIES - (208 filings)

APPLICATION OF EL PASO ELECTRIC COMPANY FOR AUTHORITY TO CHANGE RATES - (95 filings)

APPLICATION OF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC FOR APPROVAL OF ITS 2026-2028 TRANSMISSION AND DISTRIBUTION SYSTEM RESILIENCY PLAN - (77 filings)

BROKER REGISTRATIONS - (75 filings)

CY 2024 ANNUAL POWER LINE INSPECTION & SAFETY REPORT IN PURSUANT TO 16 TAC § 25.97(F) - (70 filings)

PROJECT TO SUBMIT EMERGENCY OPERATIONS PLANS AND RELATED DOCUMENTS UNDER 16 TAC § 25.53 - (62 filings)

CY 2025 FIVE-YEAR REPORTS FOR LINE INSPECTION AND SAFETY UNDER 16 TAC § 25.97 (E) - (45 filings)