Powin introduces Pod Max, a 6.26 MWh containerized battery

RYAN KENNEDY | Source: PV Magazine | Posted 05/08/2025

Keyword Tags:

The liquid-cooled batteries offer a 25% energy density increase over the company’s standard 5 MWh system.


AI generated summary

Powin has launched the Pod Max, a grid-scale lithium-ferro-phosphate (LFP) battery that boasts a capacity of 6.26 MWh within a 20-foot liquid-cooled container. This new model offers a 25% increase in energy density compared to Powin's previous 5 MWh models, making it the company's most energy-dense product to date. According to Himanshu Khurana, Powin's CTO, the Pod Max allows customers to deploy more powerful systems while reducing total ownership costs.

The design of the Pod Max emphasizes efficiency by minimizing on-site work, which results in faster installation and lower long-term maintenance costs. It is managed by Powin's StackOS platform, integrating various management systems for enhanced performance monitoring. The Pod Max is UL and IEC compliant, features fire suppression systems, and comes with a 20-year performance guarantee. Additionally, Powin offers both U.S.-sourced and internationally manufactured options to meet regulatory standards and provide tax benefits.



Link to Original Article

Please find the link to the full article below. (Please note that content provider might require a paid subscription)


Source Link: https://pv-magazine-usa.com/2025/05/07/powin-introduces-pod-max-a-6-26-mwh-containerized-battery/

Create a free trial account: Sign Up

Grid monitor is free to try. No credit card required


Already have an account? Login

Most Active PUCT Filings

APPLICATION OF ENTERGY TEXAS, INC. TO AMEND ITS CERTIFICATE OF CONVENIENCE AND NECESSITY FOR THE SETEX AREA RELIABILITY PROJECT IN JASPER, MONTGOMERY, NEWTON, POLK, SAN JACINTO, TRINITY, TYLER, AND WALKER COUNTIES - (215 filings)

APPLICATION OF EL PASO ELECTRIC COMPANY FOR AUTHORITY TO CHANGE RATES - (91 filings)

APPLICATION OF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC FOR APPROVAL OF ITS 2026-2028 TRANSMISSION AND DISTRIBUTION SYSTEM RESILIENCY PLAN - (89 filings)

CY 2024 ANNUAL POWER LINE INSPECTION & SAFETY REPORT IN PURSUANT TO 16 TAC § 25.97(F) - (80 filings)

BROKER REGISTRATIONS - (77 filings)

PROJECT TO SUBMIT EMERGENCY OPERATIONS PLANS AND RELATED DOCUMENTS UNDER 16 TAC § 25.53 - (71 filings)

COMPLAINT OF VALERO REFINING-TEXAS, LP AGAINST TEXAS-NEW MEXICO POWER COMPANY - (57 filings)