Data City, Texas, aims to power acres of data centers via renewable energy

Tricia Crimmins | Source: Tech Brew | Posted 04/08/2025

Keyword Tags:

The energy hub will be built outside Laredo on 50,000 acres of land and aims to help the US “win the AI race.”


AI generated summary

Data City, Texas, is an ambitious project initiated by Energy Abundance to construct 50,000 acres of data center infrastructure powered entirely by renewable energy. Located near Laredo, this innovative development aims to address the increasing energy demand from data centers while significantly reducing their carbon footprints. The energy produced will be utilized directly on-site, bypassing the traditional electrical grid, which is currently strained by the high energy needs of data centers.

According to Brian Maxwell, CEO of Energy Abundance, Data City will become the world's largest green energy hub for data centers, utilizing renewable sources such as solar, wind, and green hydrogen, supported by battery storage and dual-fuel gas turbines. The project is expected to provide the first 300 MW of power and one million square feet of data center space for lease starting next year, with plans to expand to 5GW of power as demand grows. Maxwell emphasizes that this initiative not only supports the AI sector in the U.S. but also represents a significant step toward a sustainable energy future.



Link to Original Article

Please find the link to the full article below. (Please note that content provider might require a paid subscription)


Source Link: https://www.emergingtechbrew.com/stories/2025/04/07/data-city-texas-renewable-energy

Create a free trial account: Sign Up

Grid monitor is free to try. No credit card required


Already have an account? Login

Most Active PUCT Filings

APPLICATION OF ENTERGY TEXAS, INC. TO AMEND ITS CERTIFICATE OF CONVENIENCE AND NECESSITY FOR THE SETEX AREA RELIABILITY PROJECT IN JASPER, MONTGOMERY, NEWTON, POLK, SAN JACINTO, TRINITY, TYLER, AND WALKER COUNTIES - (208 filings)

APPLICATION OF EL PASO ELECTRIC COMPANY FOR AUTHORITY TO CHANGE RATES - (95 filings)

APPLICATION OF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC FOR APPROVAL OF ITS 2026-2028 TRANSMISSION AND DISTRIBUTION SYSTEM RESILIENCY PLAN - (77 filings)

BROKER REGISTRATIONS - (75 filings)

CY 2024 ANNUAL POWER LINE INSPECTION & SAFETY REPORT IN PURSUANT TO 16 TAC § 25.97(F) - (70 filings)

PROJECT TO SUBMIT EMERGENCY OPERATIONS PLANS AND RELATED DOCUMENTS UNDER 16 TAC § 25.53 - (62 filings)

CY 2025 FIVE-YEAR REPORTS FOR LINE INSPECTION AND SAFETY UNDER 16 TAC § 25.97 (E) - (45 filings)