How Grid Edge Computing is Revolutionizing Real-Time Power Management
Stefan Zschiegner | Source: Power | Posted 05/28/2025

This scenario illustrates the fundamental transformation in how electrical infrastructure is managed. The traditional model—where data flows to central control centers, decisions are made and commands travel back to the field—cannot meet the demands of increasingly complex, renewable-heavy, bidirectional power networks.
AI generated summary
Grid edge computing is transforming real-time power management by enabling rapid decision-making at the edge of the electrical grid. In scenarios such as power surges caused by lightning strikes, intelligent edge devices can detect anomalies and respond within milliseconds, isolating damaged sections and rerouting power before central systems even register the event. This shift from traditional centralized control to decentralized intelligence is essential for managing increasingly complex, renewable-heavy power networks, where speed and efficiency are critical.
The architecture of grid edge systems has evolved to include advanced intelligent electronic devices (IEDs) capable of autonomous decision-making and real-time data analysis. These systems integrate seamlessly with legacy SCADA systems, employing various processing strategies to ensure immediate responses while maintaining overall network optimization. With the incorporation of artificial intelligence and machine learning, grid edge intelligence can predict failures and optimize load balancing, significantly enhancing grid reliability and resilience. As the energy landscape continues to evolve, the focus on distributed intelligence at the grid edge will be vital for accommodating renewable energy sources and ensuring a stable power supply.
Link to Original Article
Please find the link to the full article below. (Please note that content provider might require a paid subscription)
Source Link: https://www.powermag.com/how-grid-edge-computing-is-revolutionizing-real-time-power-management/
05/29 - 2:00 PM
LEGE - Senate Session05/29 - 2:00 PM
ERCOT - TWG Meeting - Webex Only05/29 - 2:00 PM
PUCT - Comments Due Project No. 5792805/30 - 2:30 PM
05/29/2025
Meeting Summary - 05/28/2025 TAC Meeting05/29/2025
PUCT now accepting applications for Texas Energy Fund Outside ERCOT grant program05/29/2025
Texas legislature passes bill to expedite solar, energy storage permitting05/29/2025
A thirsty Tesla refinery could exacerbate Corpus Christi’s water crisis05/29/2025
Texas Republicans clash over future of renewable energy in battle for party’s soulAPPLICATION OF ENTERGY TEXAS, INC. TO AMEND ITS CERTIFICATE OF CONVENIENCE AND NECESSITY FOR THE SETEX AREA RELIABILITY PROJECT IN JASPER, MONTGOMERY, NEWTON, POLK, SAN JACINTO, TRINITY, TYLER, AND WALKER COUNTIES - (150 filings)
CY 2025 RETAIL PERFORMANCE MEASURE REPORTS PURSUANT TO 16 TAC 25.88 - (127 filings)
APPLICATION OF EL PASO ELECTRIC COMPANY FOR AUTHORITY TO CHANGE RATES - (125 filings)
BROKER REGISTRATIONS - (90 filings)
PROJECT TO SUBMIT EMERGENCY OPERATIONS PLANS AND RELATED DOCUMENTS UNDER 16 TAC § 25.53 - (61 filings)
APPLICATION OF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC FOR APPROVAL OF ITS 2026-2028 TRANSMISSION AND DISTRIBUTION SYSTEM RESILIENCY PLAN - (49 filings)
APPLICATION OF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC FOR DETERMINATION OF SYSTEM RESTORATION COSTS - (35 filings)