Clean Energy Associates report shows 72% of BESS manufacturing defects happened at system level

April Bonner | Source: Energy Storage News | Posted 05/28/2025

Keyword Tags:

According to market intelligence firm Clean Energy Associates (CEA), 72% of battery energy storage system (BESS) manufacturing defects were at the system level. CEA has released its BESS Quality Risks report, a summary of the most common BESS manufacturing defects from 2024.


AI generated summary

A recent report by Clean Energy Associates (CEA) reveals that 72% of manufacturing defects in battery energy storage systems (BESS) occur at the system level, marking a 24% increase from previous years. The report outlines that cell-level defects account for 15% and module-level defects for 13%. Among the system-level defects, a significant 62% fall under 'Safety-critical failures,' which include issues with fire detection and suppression, faulty auxiliary circuit panels, and thermal management defects. CEA emphasizes that critical failures pose severe safety risks and can lead to regulatory non-compliance.

CEA's findings indicate that 64% of system-level defects are related to the balance of system (BOS), often due to component defects or improper integration procedures. Additionally, 30% of defects are enclosure-related, while 6% pertain to performance tests. The report highlights the importance of fire safety, noting that 28% of inspected BESS units had fire suppression system defects. As the energy storage sector evolves, CEA's insights underscore the need for stringent quality control and safety measures to prevent potential hazards.



Link to Original Article

Please find the link to the full article below. (Please note that content provider might require a paid subscription)


Source Link: https://www.energy-storage.news/cea-reports-72-of-bess-defects-happened-at-system-level/

Create a free trial account: Sign Up

Grid monitor is free to try. No credit card required


Already have an account? Login

Most Active PUCT Filings

APPLICATION OF ENTERGY TEXAS, INC. TO AMEND ITS CERTIFICATE OF CONVENIENCE AND NECESSITY FOR THE SETEX AREA RELIABILITY PROJECT IN JASPER, MONTGOMERY, NEWTON, POLK, SAN JACINTO, TRINITY, TYLER, AND WALKER COUNTIES - (150 filings)

CY 2025 RETAIL PERFORMANCE MEASURE REPORTS PURSUANT TO 16 TAC 25.88 - (127 filings)

APPLICATION OF EL PASO ELECTRIC COMPANY FOR AUTHORITY TO CHANGE RATES - (125 filings)

BROKER REGISTRATIONS - (90 filings)

PROJECT TO SUBMIT EMERGENCY OPERATIONS PLANS AND RELATED DOCUMENTS UNDER 16 TAC § 25.53 - (61 filings)

APPLICATION OF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC FOR APPROVAL OF ITS 2026-2028 TRANSMISSION AND DISTRIBUTION SYSTEM RESILIENCY PLAN - (49 filings)

APPLICATION OF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC FOR DETERMINATION OF SYSTEM RESTORATION COSTS - (35 filings)