Meeting Summary - 05/12/2025 RTCB Market Trials Weekly Webex
Grid Monitor AI | Posted 05/12/2025

▶️1 - Antitrust Admonition - 10:00 AM
▶️2 - Expectations of QSEs for the Week
- Current focus is on QSE submission testing in May.
- Testing includes submission of COPs, AS offers, virtual AS offers, and reporting any outages.
- QSE telemetry checkout is being conducted to ensure proper telemetry point submission to ERCOT.
- Phase two begins in early July, featuring open loop SCED tests using offers and submissions.
- Phase two includes more in-depth QSE telemetry checks, scheduled tests, and responses.
- Closed loop SCED tests planned for September and October, involving RTC offers and telemetry.
- During closed loop tests, operations will run for 2-4 hours, twice a week, with outputs provided.
- Day-ahead market submissions will be tested and evaluated.
- Expected completion and readiness for live operation is aimed for early December.
▶️3 - Communicate any known Issues with On-going Trial
- The TAC approved the market trials plan in October 2024.
- Six handbooks have been created to guide through market trials, available on the RTC+B homepage.
- Technical details and FAQs for RTC+B are being compiled and posted, based on recurring questions.
- A dual market cap is established for AS offers: capped at 2,000 MW in real-time market, 5,000 MW in DAM.
- Handbooks for market submissions, such as submitting outages or telemetry, are available.
- Ongoing focus is on connectivity and market submission testing for QSEs.
- QSEs must ensure proper telemetry point modeling and request necessary additions to meet submission requirements.
- Current phase involves sampling of resources to ensure data flow between ERCOT and QSEs.
▶️4 - Provide Snapshot of Cumulative QSE Scorecards
- Scoring for QSE scorecards will begin the week of May 19.
- Scorecards will indicate: Yellow for partial submissions, Green for complete submissions, Red for no submissions.
- Separate scorecards for submissions and telemetry setup and checkout.
- Telemetry requires 95% of QSEs to have completed point checkouts.
- Issues mentioned include user access problems due to incorrect data setup and rejected ECRS capability submission in COP.
- Workarounds involve submitting a zero for ECRS capability.
- AS only offer submission responses are not providing feedback notifications.
- A system release is planned for May 28 to address these issues.
▶️5 - Support any Technical and/or Business Questions
- Discussion on how to submit charging and discharging values for TPO/ESR within the same hour, involving a continuous curve from negative to positive megawatts.
- Clarification that for different hours, the submission would only use the negative or positive side of the curve depending on charging or discharging.
- Confirmation that issues with negative value submissions can be reported for troubleshooting.
- Questions on visibility of energy offers in MIS and where to confirm submissions.
- Guidance on materials available for Single Model ESR COPs and SOC fields, referencing the Market Submission Validation Rules document.
- Confirmation on telemetry submission details can be found on the MIS.
- Discussion about the scorecard process for submission testing with reference to three scorecards: submission side of offers, telemetry points adding, and successful checkout.
- Verification that existing known issues do not impede completion of the scorecard for submissions and telemetry checkouts.
- Clarification on what transaction types are needed for QSE generation companies that are not ESRs.
- Explanation of the weekly scorecard rolling process and result coverage in market trials meetings.
- Specific submission requirements for different resource types like wind, battery, and solar units were clarified, stating that telemetry checks involve all units, whereas submission checks involve at least one from each type.
▶️6 - Adjourn
- Meeting concluded with gratitude expressed to participants.
05/13 - 8:00 AM
ERCOT - RMS Meeting05/13 - 9:30 AM
ERCOT - OWG Meeting - Webex Only05/13 - 9:30 AM
ERCOT - SSWG Planning Data Dictionary/ CTG Training - Webex Only05/13 - 9:30 AM
05/13/2025
House proposes early phase out of IRA clean energy tax credits05/13/2025
GreenFire Energy demonstrates energy production from idle geothermal wells in The Geysers05/13/2025
NRG Energy to acquire 18 natural gas power plants in $12 billion deal to serve data centers and others05/13/2025
Texas Is Failing To Fix The Grid (Again)05/13/2025
Relief for renewables? US, China reach deal for 90-day pause on tariffsAPPLICATION OF ENTERGY TEXAS, INC. TO AMEND ITS CERTIFICATE OF CONVENIENCE AND NECESSITY FOR THE SETEX AREA RELIABILITY PROJECT IN JASPER, MONTGOMERY, NEWTON, POLK, SAN JACINTO, TRINITY, TYLER, AND WALKER COUNTIES - (202 filings)
APPLICATION OF EL PASO ELECTRIC COMPANY FOR AUTHORITY TO CHANGE RATES - (95 filings)
BROKER REGISTRATIONS - (81 filings)
APPLICATION OF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC FOR APPROVAL OF ITS 2026-2028 TRANSMISSION AND DISTRIBUTION SYSTEM RESILIENCY PLAN - (79 filings)
CY 2024 ANNUAL POWER LINE INSPECTION & SAFETY REPORT IN PURSUANT TO 16 TAC § 25.97(F) - (69 filings)
PROJECT TO SUBMIT EMERGENCY OPERATIONS PLANS AND RELATED DOCUMENTS UNDER 16 TAC § 25.53 - (63 filings)
CY 2025 FIVE-YEAR REPORTS FOR LINE INSPECTION AND SAFETY UNDER 16 TAC § 25.97 (E) - (44 filings)