Texas ‘open’ for data center boom as lawmakers grapple with its challenges

Sara DiNatale | Source: San Antonio Express News | Posted 03/08/2025

Related controls:
Keyword Tags:

With S.B. 6, legislators propose new laws to prep the grid of the future in face of skyrocketing demand.


AI generated summary

Texas is experiencing a surge in data center development, with proposed facilities requiring more electricity than entire cities. Lawmakers, led by Senator Phil King, are addressing the challenges posed by this increased demand, particularly in terms of energy infrastructure and costs. King has introduced Senate Bill 6, which aims to prepare the state for the anticipated rise in energy needs while ensuring that the financial burden does not fall solely on Texas ratepayers.

The bill seeks to improve demand forecasting, enhance utility flexibility during emergencies, and adjust how large power users contribute to transmission costs. As Texas faces a potential doubling of energy demand by the end of the decade, the legislation aims to balance the needs of data centers with the protection of residential consumers. However, concerns remain about the implementation of these changes and their impact on both energy users and the state's grid reliability.



Link to Original Article

Please find the link to the full article below. (Please note that content provider might require a paid subscription)


Source Link: https://www.expressnews.com/business/article/texas-grid-ercot-senate-sb6-data-centers-20191988.php

Create a free trial account: Sign Up

Grid monitor is free to try. No credit card required


Already have an account? Login

Most Active PUCT Filings

APPLICATION OF EL PASO ELECTRIC COMPANY FOR AUTHORITY TO CHANGE RATES - (150 filings)

BROKER REGISTRATIONS - (76 filings)

PROJECT TO SUBMIT EMERGENCY OPERATIONS PLANS AND RELATED DOCUMENTS UNDER 16 TAC § 25.53 - (47 filings)

APPLICATION OF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC FOR DETERMINATION OF SYSTEM RESTORATION COSTS - (43 filings)

CY 2025 ELECTRIC UTILITY TRANSMISSION CONSTRUCTION REPORTS UNDER 16 TAC § 25.83 - (33 filings)

YEAR-END 2024 ELECTRIC UTILITY EARNINGS REPORTS IN ACCORDANCE WITH 16 TAC § 25.73 - (32 filings)

APPLICATION OF SOUTHWESTERN ELECTRIC POWER COMPANY TO AMEND ITS CERTIFICATE OF CONVENIENCE AND NECESSITY TO CONSTRUCT THE HALLSVILLE NATURAL GAS PLANT IN HARRISON COUNTY, TEXAS AND CONVERT WELSH POWER PLANT UNITS 1 AND 3 TO NATURAL GAS - (32 filings)