PUCT to begin accepting applications for Texas Energy Fund Completion Bonus Grant Program

Odessa American, Texas | Source: Yahoo | Posted 01/01/2025

Keyword Tags:

The Completion Bonus Grant Program will provide performance-based grants to qualifying projects for the construction of new dispatchable electric generating facilities in the Electric Reliability Council of Texas (ERCOT) power region, or the addition of new dispatchable electric generating units at existing facilities that provide power to the ERCOT power region. 


AI generated summary

The Public Utility Commission of Texas (PUCT) will be launching the Texas Energy Fund (TEF) Completion Bonus Grant Program, beginning on January 1, 2025. This program aims to provide performance-based grants to projects involved in constructing new dispatchable electric generating facilities in the ERCOT power region or adding units to existing facilities within ERCOT that contribute power. Projects must increase the ERCOT grid's dispatchable generation capacity by a minimum of 100 MW to qualify for the grant.

Qualified applicants interested in the Completion Bonus Grant must submit an application via the TEF Portal and a submission statement on the PUCT Interchange under Project No. 57308. Resources to aid applicants are offered on the TEF Online website, and detailed information on eligibility and the application process can be found in PUCT rule 16 TAC §25.511, which was adopted by the PUCT on April 25, 2024. The TEF, established under the Powering Texas Forward Act, was voted into existence through a constitutional election in November 2023 and aims to provide funding for electric facility construction and maintenance inside and outside the ERCOT power region.



Link to Original Article

Please find the link to the full article below. (Please note that content provider might require a paid subscription)


Source Link: https://www.yahoo.com/news/puct-begin-accepting-applications-texas-164600326.html

Create a free trial account: Sign Up

Grid monitor is free to try. No credit card required


Already have an account? Login

Upcoming Meetings
Most Active PUCT Filings

APPLICATION OF ENTERGY TEXAS, INC. TO AMEND ITS CERTIFICATE OF CONVENIENCE AND NECESSITY FOR THE SETEX AREA RELIABILITY PROJECT IN JASPER, MONTGOMERY, NEWTON, POLK, SAN JACINTO, TRINITY, TYLER, AND WALKER COUNTIES - (292 filings)

CY 2024 ANNUAL POWER LINE INSPECTION & SAFETY REPORT IN PURSUANT TO 16 TAC § 25.97(F) - (88 filings)

APPLICATION OF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC FOR APPROVAL OF ITS 2026-2028 TRANSMISSION AND DISTRIBUTION SYSTEM RESILIENCY PLAN - (86 filings)

APPLICATION OF ENTERGY TEXAS, INC. TO AMEND ITS CERTIFICATE OF CONVENIENCE AND NECESSITY TO CONSTRUCT A PORTFOLIO OF DISPATCHABLE GENERATION RESOURCES - (80 filings)

APPLICATION OF EL PASO ELECTRIC COMPANY FOR AUTHORITY TO CHANGE RATES - (73 filings)

BROKER REGISTRATIONS - (67 filings)

APPLICATION OF CROSS TEXAS TRANSMISSION, LLC FOR AUTHORITY TO CHANGE RATES AND TARIFFS - (56 filings)