Solar panel recycling in Texas

Luke Metzger and Lucas Collins | Source: Environment Texas | Posted 12/27/2024

Keyword Tags:

These are sunny days for solar power in Texas. A 2024 report by American Clean Power shows that Texas has surpassed California in utility-scale solar energy capacity. 


AI generated summary

A report by American Clean Power reveals that Texas has surpassed California in utility-scale solar energy capacity, indicating a bright future for solar power in the state. However, as solar panels have a lifespan of 25-30 years, there is a growing concern about end-of-life management. Currently, nearly 90% of decommissioned solar panels in Texas end up in landfills, posing an environmental challenge.

To address the issue, the state has several recycling facilities for solar panels such as Electronic Recyclers International, Echo Environmental Holdings, Device Services Group, and SolarCycle. Recycling these panels not only prevents wastage but also allows for the recovery of valuable raw materials. By investing in recycling infrastructure, Texas can lead the way in sustainable energy practices and set a global example for the renewable energy sector, ensuring a clean and circular future for solar power in the state.



Link to Original Article

Please find the link to the full article below. (Please note that content provider might require a paid subscription)


Source Link: https://environmentamerica.org/texas/center/articles/solar-panel-recycling-in-texas/

Create a free trial account: Sign Up

Grid monitor is free to try. No credit card required


Already have an account? Login

Most Active PUCT Filings

APPLICATION OF EL PASO ELECTRIC COMPANY FOR AUTHORITY TO CHANGE RATES - (158 filings)

CY 2025 RETAIL PERFORMANCE MEASURE REPORTS PURSUANT TO 16 TAC 25.88 - (109 filings)

BROKER REGISTRATIONS - (74 filings)

APPLICATION OF ENTERGY TEXAS, INC. TO AMEND ITS CERTIFICATE OF CONVENIENCE AND NECESSITY FOR THE SETEX AREA RELIABILITY PROJECT IN JASPER, MONTGOMERY, NEWTON, POLK, SAN JACINTO, TRINITY, TYLER, AND WALKER COUNTIES - (55 filings)

YEAR-END 2024 ELECTRIC UTILITY EARNINGS REPORTS IN ACCORDANCE WITH 16 TAC § 25.73 - (46 filings)

PROJECT TO SUBMIT EMERGENCY OPERATIONS PLANS AND RELATED DOCUMENTS UNDER 16 TAC § 25.53 - (43 filings)

APPLICATION OF CENTERPOINT ENERGY HOUSTON ELECTRIC, LLC FOR DETERMINATION OF SYSTEM RESTORATION COSTS - (31 filings)